Fandom

White Day: A Labyrinth named School Wiki

Construction Area Note

359pages on
this wiki
Add New Page
Comments0 Share
I story

This is an example image

Construction Area Note is a note White Day: A Labyrinth Named School and Remake. It details the data of Air duct.

LocationEdit

It is found in hallway leading to the Home Economics Classroom and Workshop on the 1st floor of Main Building, Section 1 of Yeondu High School.

TranscriptEdit

2001Edit

Construction Memo

The main building's first floor needs some lighting work. Oddly enough, the switchboard wires in the machine room are tangled up, so we may need to strip a lot of the floorboards and wall sheets back.

If this work is needed, then the extractor fan connected to the machine room, home economics room, and the girl's bathroom will need to be removed.

공사구역의 쪽지

본관1층 조명 수리작업

-예상과는 달리 기계 실습실의 배전반으로부터 나온 배선이 엉망이라서 큰 규모의 공사를 요망.

-전체 공사를 실시할 경우에는 기계 실습실과 가정 실습실, 화장실까지 연결된 환풍구를 제거해야 함.

2015Edit

Construction Area Note

Lightning repair work in the first floor of the Main Building.

- The Workshop's wiring will be a larger job than anticipated.

- The repair calls for more extensive construction work; removal of the ventilation connecting the Workshop, Home Economics Room, and the bathrooms will be necessary.

공사구역의 쪽지

본관 1층 조명 수리 작업 내역

-예상과는 달리 기계 실습실의 배전반으로부터 나온 배선이 엉망이라서 큰 규모의 공사를 요망.

-전체 공사를 실시할 경우에는 기계 실습실과 가정 실습실, 화장실까지 연결된 환풍구를 제거해야 함.

GalleryEdit

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.